PROJECT DETAILS —

WATER TREATMENT PLANT
UPGRADATION

PESHAWAR, KPK

Upgradation of existing WTP to improve treatment capacity, enhance water quality, and ensure efficient and reliable operation for the growing population.

Project Year
2023
Client
Municipal Authority
Category
Water Treatment
Status
Completed
WTP Project

PROJECT OVERVIEW

The project involved the upgradation of an existing Water Treatment Plant (WTP) to increase its capacity, improve treatment efficiency, and ensure compliance with national and international water quality standards.

Aflow Services was responsible for the complete engineering, supply, installation, testing, and commissioning of all mechanical, electrical, and automation systems.

The upgraded plant now delivers safe, clean, and reliable drinking water to thousands of residents with improved operational efficiency.

KEY HIGHLIGHTS

  • Increased treatment capacity by 40%
  • Upgraded filtration and disinfection systems
  • Implemented SCADA for real-time monitoring
  • Energy efficient pumps and motors installed
  • Improved water quality and system reliability
  • Reduced operational and maintenance costs

PROJECT GALLERY

Filtration Tanks
Pump House
Chemical Dosing Station
Industrial Control Panel

SCOPE OF WORK

  • Detailed engineering and design
  • Supply of mechanical and electrical equipment
  • Installation of pumps, motors and piping systems
  • LT panel design and installation
  • SCADA design, programming and installation
  • Testing, commissioning and operator training
  • Operation & maintenance support

PROJECT RESULTS

40%

Increase in Treatment Capacity

100%

Compliance with Quality Standards

20%

Improvement in Energy Efficiency

30%

Reduction in Maintenance Cost

WTP Results
OUR PROJECT EXECUTION PROCESS —
Requirement
Analysis
Engineering
& Design
Procurement
Installation &
Integration
Testing &
Commissioning
Operation &
Support