PROJECT DETAILS —

WATER SUPPLY SCHEME
INSTALLATION

MARDAN, KPK

Design and installation of a comprehensive water supply system including pipeline network, pumping stations, and distribution points for rural communities.

Year
2022
Client
Public Health
Category
Water Supply
Status
Completed
WSS Project

PROJECT OVERVIEW

This project aimed to provide safe drinking water to over 50,000 residents in Mardan through a newly designed water supply scheme. The scope covered everything from source identification to household connections.

Our team executed the installation of over 25km of pipeline network across challenging terrain, ensuring minimal disruption to the local environment and community.

KEY HIGHLIGHTS

  • 25km+ Pipeline Network
  • 50,000+ People Benefited
  • Solar Powered Pumping Solution
  • GIS Based Asset Mapping
  • Automated Chlorination System

PROJECT GALLERY

Pipeline Installation
Solar Pumping Station
Chlorination System
GIS Asset Mapping

PROJECT RESULTS

100%

Household Coverage

0%

Leakage Rate Achieved

60%

Energy Cost Reduction

WSS Results