PROJECT DETAILS —

PUMP AND MOTOR
EFFICIENCY PROJECT

CHARSADDA, KPK

A performance optimization project involving high-precision efficiency testing and energy audits of industrial pumping systems to reduce operational costs.

Year
2023
Client
Water Utility
Category
Testing
Status
Completed
Pump Efficiency Project

PROJECT OVERVIEW

The objective of this project was to audit and optimize the efficiency of the main pumping station in Charsadda. Our team used specialized ultrasonic flow meters and power analyzers to create detailed performance maps.

Based on the data, we implemented precision laser alignment and vibration rectification, which significantly extended the life of the assets and reduced energy consumption.

KEY HIGHLIGHTS

  • Complete System Energy Audit
  • Ultrasonic Flow Measurement
  • Precision Shaft Alignment
  • ROI Analysis & Reporting
  • Vibration Level Control

PROJECT GALLERY

G1
G2
G3
G4

PROJECT RESULTS

22%

Measured Energy Saving

60%

Reduction in Vibration

8 Months

Payback Period

Efficiency Results